Interlock Application - Prevent Paralleling of Lines

Scheme # 21

To prevent paralleling three power sources through a common tie bus not normally in service. To permit feeding any load bus from a second power source through the tie bus only when authorized by supervisor. To permit one power source to supply all three load busses through the tie bus only when authorized by supervisor.

Interlock Application Scheme #  21 - Preven Paralleling of Lines

Breakers A, B, and C are normally closed. Breakers D, E, and F are normally open. Under normal conditions key A-1 is held in breaker A interlock, key A-2 is held in breaker B interlock, and key A-3 is held in breaker C interlock. Key A-5 is retained by supervisor.

To transfer load from line No. 1 to line No. 2 or line No. 3 through tie bus, proceed as follows:

  1.
2.

3.

4.
5.


6.
Open breaker A.
Turn key A-1 in L-O interlock on breaker A to lock breaker open. Key A-1 is now free.
Insert key A-1 in L-O interlock on breaker D and turn to unlock. Key A-1 is now held.
Close breaker D.
Insert supervisor's key A-5 (only one A-5 is available) in L-O interlock on either breaker E or F and turn to unlock. Key A-5 is now held.
Close breaker E or F (whichever is selected).

Reverse sequence to restore load to line No. 1.

To transfer load from lines No. 1 and No. 2 to line No. 3 through tie bus, proceed as follows:

  1.
2.
3.

4.

5.
6.

7.

Close breaker D as per steps 1 to 4 above.
Open breaker B.
Turn key A-2 in L-O interlock on breaker B to lock breaker open. Key A-2 is now free.
Insert key A-2 in L-O interlock on breaker E and turn to unlock. Key A-2 is now held.
Close breaker E.
Insert supervisor's key A-5 in L-O interlock on breaker F and turn to unlock. Key A-5 is now held.
Close breaker F.

Reverse sequence to restore load to lines No. 1 and No. 2.


Links for more interlock application scheme information:

Contents | Introduction | Symbols Legend | Scheme Book

Scheme # 25
Scheme # 26
Scheme # 27
Scheme # 28
Scheme # 29
Scheme # 30
Scheme # 31
Scheme # 32

Scheme # 33 Scheme # 34
Scheme # 35
Scheme # 35A

Scheme # 36

Scheme # 37
Scheme # 38
Scheme # 39
Scheme # 40
Scheme # 41
Scheme # 42
Scheme # 42A
Scheme # 42B

Scheme # 43
Scheme # 43A
Scheme # 44
Scheme # 45
Scheme # 45A

 
   

Copyright © 2000-2007 Kirk Key Interlock. All Rights Reserved.
Terms and Conditions
Web Site, Graphics & Design by R.S.Venables