Contents
| Introduction
| Symbols
Legend | Scheme
Book
Interlock
Application
- Capacitor Bank Access
Scheme # 37
To prevent closing ground switch B under load and to enable
access to the capacitor bank enclosure only after the
capacitor bank has been grounded and discharged.

Breaker A is closed. Ground switch B is locked open. All
capacitor bank enclosure doors are locked closed. Key
A-1 is held in L-O interlock on breaker A. Key A-2 is
held in L-C interlock on ground switch B. Key A-3 is held
in L-C interlock (Type M2D) on access door #1.
To
gain access to capacitor bank enclosure, proceed as follows:
|
|
1.
2.
3.
4.
5.
6.
7.
8. |
Open breaker A.
Turn key A-1 in L-O interlock on breaker A to lock
open. Key A-1 is now free.
Insert key A-1 in L-O interlock on ground switch B
and turn to unlock. Close ground switch B. Key A-1
is now held.
Turn key A-2 in L-C interlock on ground switch B to
lock closed. Key A-2 is now free.
Insert key A-2 in L-C interlock (Type M2D) on capacitor
bank enclosure access door #1 and turn to unlock.
Key A-2 is now held and key A-3 is now free.
Open access door #1 to enter capacitor bank enclosure.
Insert key A-3 in L-C interlock (Type D) on access
door #2 and turn to unlock. Key A-3 is now held.
Open access door #2 to enter capacitor bank enclosure. |
Reverse
sequence to restore service.
|